SLS - space launch system (3-я попытка)
 
Цитата
Boeing Space‏ Подлинная учетная запись @BoeingSpace 34 мин. назад

Our Michoud team is welding the last element of the second @NASA_SLS core stage. It's built to power the crewed Artemis-2 Moon mission.


 
Наш олень
https://www.nasa.gov/press-release/nasa-administrator-to-discuss-status-of-rocket-for-first-artemis-lunar-mission/

Изменено: Чебурашка - 08.08.2019 22:26:08
 
Цитата
Chris B - NSF‏ @NASASpaceflight 2 ч. назад

FEATURE ARTICLE:
Boeing assembling structures for NASA’s second SLS Core Stage -

https://www.nasaspaceflight.com/2019/08/boeing-assembling-second-sls-core-stage/ ...

Philip Sloss with a 3,500 feature checking in on the progress being made on the SLS rocket being built for Artemis-2, the first crewed mission.

 
https://blogs.nasa.gov/groundsystems/2019/08/15/rotation-processing-and-surge-facility-ready-for-artemis-1/
https://blogs.nasa.gov/kennedy/2019/08/15/rotation-processing-and-surge-facility-ready-for-artemis-1/
Цитата
Rotation, Processing and Surge Facility Ready for Artemis 1

Linda Herridge
Posted Aug 15, 2019 at 2:05 pm



Technicians watch as a crane and special mechanism begin breakover, or flipping, of the mated Thrust Resistance Structure and the Guidance Control Assembly for the Orion Program’s Ascent Abort-2 flight test during practice, or pathfinder activities, June 22, 2018, inside Exploration Ground Systems’ Rotation, Processing and Surge Facility high at NASA’s Kennedy Space Center in Florida. Many pathfinding tests were completed on the flight hardware in preparation for the flight test. Photo credit: NASA/Ben Smegelsky

The Rotation, Processing and Surge Facility (RPSF) at NASA’s Kennedy Space Center in Florida will receive the solid rocket booster segments for final assembly of NASA’s Space Launch System (SLS) rocket. The agency’s Exploration Ground Systems (EGS) team successfully completed the system acceptance review and operational readiness review for the facility on July 25, 2019. This review evaluated the RPSF’s readiness to receive, process, integrate and launch flight hardware for Artemis 1 and beyond.

“The RPSF is the first processing facility at Kennedy to reach operational readiness status, and our team is looking forward to the arrival of the flight hardware so we can get to work preparing for the Artemis 1 launch,” said Mike Chappell, EGS associate program manager with lead contractor, Jacobs.

When the booster segments arrive at Kennedy, the pieces are inspected before two 200-ton cranes are positioned to lift the segments from a horizontal position to a vertical position. The RPSF also will receive the booster aft skirt from the Booster Fabrication Facility. During processing, the aft segment is attached to the aft skirt and aft exit cone.

All of the SLS solid rocket components processed in the RPSF will be transported to the Vehicle Assembly Building for final assembly with the SLS core stage and Orion spacecraft on top of the mobile launcher for the agency’s Artemis missions.

The RPSF is part of the infrastructure at Kennedy that will help NASA launch the Artemis missions and send the first woman and next man back to the Moon by 2024.
 
Джими в прямом эфире на фоне очень большой и толстой ракеты из трёх букв.

https://twitter.com/JimBridenstine/status/1162033949591216128
Изменено: Чебурашка - 15.08.2019 22:53:06
 
Сваривают обечайки водородного бака второй лётной ракеты

https://pbs.twimg.com/media/ECC0C25XsAE-6lr?format=jpg&name=large
 
На следующей неделе двигательную секцию будут стыковать с остальной частью ракеты.
Джими только что зуб дал  ;)
Изменено: Чебурашка - 20.08.2019 17:45:06
 
https://spacenews.com/sls-contractors-expect-first-launch-in-2021/
Цитата
SLS contractors expect first launch in 2021
by Jeff Foust — August 20, 2019

Companies working on the Space Launch System now expect its first launch in early 2021, based on the time needed to perform a Green run test of the core stage and then prepare the vehicle for launch. Credit: NASA

WASHINGTON — While NASA has yet to update the schedule for the first flight of its Space Launch System, companies working on the heavy-lift rocket now expect the rocket to launch in early 2021 rather than 2020.

The first launch of the SLS, on a mission called Artemis 1, had been formally scheduled for the second half of 2020, a date that already represented two years’ worth of delays. That date is under review as NASA brings in new leadership for its exploration programs after reassigning former associate administrator Bill Gerstenmaier and his deputy, Bill Hill, in July.

During an Aug. 19 panel discussion at the American Institute of Aeronautics and Astronautics’ Propulsion and Energy Forum in Indianapolis, executives with companies involved with the SLS projected that, based on what work needs to be done to complete the vehicle for launch, that launch probably won’t take place before early 2021.

Jeff Foote, vice president of NASA programs at Northrop Grumman Innovation Systems, said he expected that, with the agency deciding to perform a “Green Run” static-fire test of the core stage at the Stennis Space Center next year, that core stage won’t arrive at the Kennedy Space Center for launch preparations until late 2020.

“Fr om that time forward, with the integration of Orion, wet dress rehearsal and that sort of thing, there’s probably two quarters, maybe two and a half quarters, or work to get to a launch date,” he estimated. “So, most likely early in 2021. It could happen earlier, it could happen later.”

The core stage has been on the critical path for the launch for some time because of problems with its engine section. Both NASA and Boeing now expect the core stage to be completed and ready to ship to Stennis at the end of the year.

“We’ll probably fire it off in the second or third quarter of next year, and do a full test,” Robert Broeren, the integrated product team lead for SLS stages at Boeing, said of the Green Run test on the panel. “After that, it probably takes quite a bit of time to do rework and some upgrades to it, then we’ll put it on a barge and send it down to the Cape.”

Earlier this year NASA said it was considering whether the Green Run test was necessary, since skipping it could save several months of schedule. However, NASA Administrator Jim Bridenstine announced July 25 that NASA would go ahead with the test.

Bridenstine visited the Michoud Assembly Facility in New Orleans wh ere Boeing is building the core stage Aug. 15, and said later he was impressed with the progress that we saw. “What I saw there was absolutely eye-watering,” he said Aug. 16 during a separate event at the Marshall Space Flight Center. He acknowledged the challenges in the engine section that delayed completion of the core stage, and NASA’s efforts to get around it by integrating the other sections of the core stage first.

That engine section, he said, is nearly ready to be integrated to the rest of the core stage, to be followed by its four RS-25 engines. He confirmed that work should be completed by the end of the year.

Bridenstine didn’t discuss the schedule for Artemis 1 in those remarks, but in July 17 testimony before the Senate Commerce Committee suggested a first launch in 2021, rather than 2020, was likely. “I think 2021 is definitely achievable” for that mission, he said then, but noted he wanted to bring in new leadership for the agency’s exploration program before setting a firm date.

A slip to 2021 would not necessarily delay the first crewed SLS/Orion mission, Artemis 2, now scheduled for 2022. “If Artemis 1 launches no later than mid 2021, there will be no impact to Artemis 2,” Bridenstine said in an Aug. 3 email to Sen. Mike Enzi (R-Wyo.), who several days earlier wrote to the NASA administrator about his concerns about cost and schedule problems with SLS and other major NASA programs.

“This is a realistic plan,” Bridenstine added, “but I would like to have new leadership in place and committed to an integrated schedule before committing to a date.”
 
https://tass.ru/kosmos/6780529
Цитата
20 АВГ, 18:27
Сборка тяжелой ракеты SLS для полета на Луну будет завершена к концу 2019 года

Ранее NASA сообщало о том, что планирует провести испытательный полет SLS с новым кораблем Orion вокруг Луны, при этом сроки не уточнялись

ВАШИНГТОН, 20 августа. /ТАСС/. Сборка тяжелой ракеты Space Launch System (SLS), которую США планируют использовать для отправки астронавтов на Луну в рамках программы Artemis, будет завершена к концу 2019 года. Об этом заявил во вторник вице-президент США Майкл Пенс на заседании Национального космического совета.

"Space Launch System, самая мощная в мире ракета, на которой американские астронавты отправятся на Луну, будет полностью собрана к концу этого года", - сказал он.

"Я бы сказал, что она завершена на 90% в настоящий момент", - отметил в свою очередь директор Национального управления США по аэронавтике и исследованию космического пространства (NASA) Джеймс Брайденстайн. "К концу этого года, как вы правильно сказали, ее сборка на заводе будет завершена, и мы испытаем ее", - заявил он, обращаясь к Пенсу.

Ранее NASA сообщало о том, что планирует провести испытательный полет SLS с новым кораблем Orion вокруг Луны, при этом сроки не уточнялись. Испытательный запуск SLS до этого неоднократно переносился. Изначально он был запланирован на 2019 год, затем перенесен на вторую половину 2020 года. Позднее Брайденстайн сообщал о том, что рассматривает новые сроки, не уточняя конкретных дат.

К 2028 году NASA планирует "обеспечить постоянное присутствие человека на Луне, чтобы продолжить научные исследования и открытия, продемонстрировать новые технологии и заложить основу для будущих миссий на Марс". Весной NASA объявило о том, что новая программа высадки астронавтов на Луну называется "Артемида". Администрация США приняла решение начать подготовку к полетам автоматических аппаратов и пилотируемых кораблей к Луне и использовать эту программу в качестве важного шага для организации путешествий в дальний космос, в первую очередь на Марс. Американские специалисты рассчитывают осуществить высадку на Луну в 2024 году и отправить астронавтов к Марсу ориентировочно в середине 2030-х годов.
 
Что то непонятно. К концу года будет Собрана. А испытания собранной первой ступени с прожигом запланированы или нет?
 
Цитата
pnetmon написал:
Что то непонятно. К концу года будет Собрана. А испытания собранной первой ступени с прожигом запланированы или нет?

Пока так...

август 2019 - прикручивают двигательную секцию
декабрь 2019 - полностью собранная и укомплектованная Core Stage покидает центр им. Маршала и отправляется на стенд для огневых испытаний
июнь 2020 - огневое испытание Core Stage на полную длительность
ноябрь 2020 - запуск SLS

На что обращаем внимание.
Здесь  одно изделие для всех испытаний - заправочные + огневые + лётные.

Контраст с рарзработкой "Энергии" в 80-х. Там было три изделия.
4М - для отработки заправки и интеграции со стартовыым комплексом в 1984-85 гг.
5С - для огневых на полную длительность в 1986 г.
6СЛ - собственно первое лётноё изделие в 1987 г.
Изменено: Чебурашка - 21.08.2019 10:01:37
 
Цитата
Чебурашка написал:
Здесь  одно изделие для всех испытаний - заправочные + огневые + лётные.
Видать не дают разработчикам сильно развернуться - ограничивают в деньгах... Да и двигателей в запасе не слишком много...
И мы пошли за так, на четвертак, за ради бога
В обход и напролом и просто пылью по лучу...
 
Цитата
Чебурашка написал:
ноябрь 2020 - запуск SLS
такой даты на сейчас нету, это написано в сообщение spacenews выше чем сообщение ТАСС

Просто ТАСС пишет к концу 2019 года SLS будет собрана. SLS первого запуска состоит минимум Core Stage + boosters + ICPS. Огненные испытания Core Stage в 2020 году. Вот как понимать Собрана если кажется испытываться Core Stage будет без установленных других крупных элементов SLS?
Или Собрана - это Собрали минимум Core Stage + boosters + ICPS - проверили связь между собой, разобрали, отвезли и испытали Core Stage, привезли обратно и опять собрали Core Stage + boosters + ICPS?

Цитата
https://tass.ru/kosmos/6780529
Сборка тяжелой ракеты Space Launch System (SLS)
ТАСС вообще скоро запутает
Цитата
https://tass.ru/kosmos/6778514
ПЯТИГОРСК, 20 августа. /ТАСС/. Российская ракета-носитель сверхтяжелого класса будет примерно в четыре раза дешевле американской, сообщил во вторник глава Роскосмоса Дмитрий Рогозин на встрече с участниками форума "Машук".
...
Пока, по нашим расчетам, российская сверхтяжелая ракета будет примерно в четыре раза дешевле американской, что важно для страны", - сказал Рогозин.

Он не уточнил, о какой именно американской ракете идет речь. В настоящее время в США эксплуатируются тяжелые ракеты Falcon Heavy компании SpaceX.
...
Изменено: pnetmon - 21.08.2019 11:51:10
 
На стенде будет испытана Core Stage.
Стыковать с твёрдотполивными ускорителями будут уже на космодроме.
 
эх, а еще пару лет назад тут было так весело )) - Senate Launch System must die (с) ВалериJ
Главное не наличие проблем, главное способность их решать.
У каждой ошибки есть Имя и Фамилия
 
Цитата
LRV_75 написал:
Senate Launch System must die
А что-то изменилось? Мастдай он и есть мастдай, винда например... Так ведь не умерла...
И мы пошли за так, на четвертак, за ради бога
В обход и напролом и просто пылью по лучу...
 
Цитата
Preparing America for Deep Space Episode 22: Building & Testing for Artemis

NASA Johnson

Опубликовано: 23 авг. 2019 г.

NASA is working to land the first woman and the next man on the Moon by 2024. Teams across the country are charging ahead to make that happen as they build and test the Space Launch System (SLS) rocket, Orion spacecraft, and Exploration Ground Systems (EGS) at NASA’s Kennedy Space Center.

Some major recent milestones include: Orion – Spacecraft processing at the Operations & Checkout Building at NASA’s Kennedy Space Center; Successfully testing the launch abort system during the Ascent Abort-2 Test at Cape Canaveral. SLS – Connecting the Liquid Hydrogen Tank to the Core Stage; loading the Liquid Oxygen Tank Structural Test Article onto the Pegasus Barge at Michoud Assembly Facility in New Orleans. EGS – Mobile Launcher (ML) Roll-Out to Launch Pad 39B; Water Flow Test with the ML; Lightning Tower Painting at Pad 39B; and the Tail Service Mast Umbilical Drop Test.
https://www.youtube.com/watch?v=eP1_T8vKgwE (3:21)
 
Цитата
Chris B - NSF‏ @NASASpaceflight 1 мин. назад

FEATURE ARTICLE:
Boeing completes first NASA SLS engine section, getting ready for final Core Stage mate -

https://www.nasaspaceflight.com/2019/08/sls-engine-section-ready-final-core-mate/

5,500 words over three pages from Philip Sloss.
 
Джими: "Хренасе, какая она большая..."

 
https://www.nasaspaceflight.com/2019/08/sls-engine-section-ready-final-core-mate

Судя по статье, Core Stage должна отправиться с завода-изготовителя 10 декабря   They hope....
Изменено: Чебурашка - 25.08.2019 22:03:57